our branches

NAVLAKHI

NAVLAKHI Branch (This port is managed by Jamnagar Branch)
“MONALISA” 2 nd Floor,
Opp Income Tax Office,Pandit Nehru Marg,
Jamnagar – 361001
Person in Charge : Mr. M. Parmar
Tel : +91 0288 2553761
Email : jamnagar.cb@chowgule.co.in

NAUTICAL POSITION

Latitude: 70° 27′ 24″ E
Longitude: 22° 58′ N

GEOGRAPHICAL LOCATION

Navlakhi is an all weather lighterage working port located at inner position of Gulf of Kutch on the West coast.

AUTHORITY

Gujarat Maritime Board

PORT OFFICIAL

NAME

DESIGNATION

CONTACT NOS.

Capt. AK Solanki

Port Officer

+91 02822 220435

 

SALIENT FEATURES (ARRIVING / SAILING)

ANCHORAGE

Cargo being discharged/loaded at anchorage only

APPROACH

Cargo being moved from shore through lighters to alongside ship at working anchorage

WEATHER

All weather port. Monsoon season from 15th May to 15th Sept

PILOTAGE

Compulsory

PORT CRAFT

Tug 404 bhp 2

NIGHT NAVIGATION

No such facilities in case of VSL at inner Anchorage.VSL working at outer roads are permitted to sail during night hours

 

BERTHS

LENGTH (m)

DRAFT (m)

TYPES OF CARGO HANDLED

BERTH FACILITIES

anchorage port

General cargo

CARGO HANDLING EQUIPMENT

PRIVATE FLOATING CRANES AND EXCAVATOR CRANES AVAILABLE

WORKING SHIFTS

NO PORT WORKING SHIFT

STEVEDORES WORK ROUND THE CLOCK

WORKING DAYS / WEEK

ALL DAYS WEEK

STORAGE

TOTAL STORAGE AREA 160000 SQM

 

PORT CONNECTIVITY

PORT IS CONNECTED WITH STATE HIGHWAY (SH-24) BROAD GAUGE RAIL LINK IS CONNECTED WITH JETTY. NATIONAL HIGHWAY (NH-84) IS 50 KM AWAYS FROM MORBI AND 55 KM AWAY FROM MALIYA

COMMUNICATION & TRANSPORT

VIA VHF CHENNEL NO 16/

PROVISIONS

FACILITIES ARE AVAILBLE TO SUPPLY AT THIS PORT

BUNKERS

FACILITIES ARE AVAILBLE TO SUPPLY AT THIS PORT

WATER SUPPLY

FACILITIES ARE AVAILBLE TO SUPPLY AT THIS PORT

SHIP REPAIRS

NO FACILITIES

GARBAGE

NOT PERMITTED

MEDICAL FACILITIES

FACILITIES ARE AVAILBLE AT MORVI /RAJKOT  CITY

WATCHMAN

AVAILABLE FACILITIES

LIGHTERS

AVAILABLE

 

FUTURE DEVELOPMENTS 

A MULTI PURPOSE TERMINAL BY DMCC IS PROPOSED AT THE PORT WITH INSTALLED CAPACITY OF 4 MMTPA. TERMINAL IS LIKELY TO BE COMPLETED BY THE YEAR 2014-15( YET NOT COMMISIONED )